Fence Contractors in Independence, MO
2 fence companies in Independence publish installed pricing, and across every material they quote the range runs $18 to $70 per linear foot. Bamboo is the cheapest way to fence a yard here at $18 to $41 per foot, which puts a 150-foot run at $2,700 to $6,150.
Price Your Fence in Independence
Draw your fence line on a satellite map to get a length and a cost range for this property.
Loading Fence Planner...
Enter your address to get started
We'll show a satellite view of your property so you can draw fence lines.
Fence Cost by Material in Independence
Installed cost per linear foot, taken from the published rates of the 2 contractors listed on this page, with each material set against the Missouri average.
| Material | Independence /ft | 150 ft installed | vs MO | Quotes |
|---|---|---|---|---|
| Vinyl | $40 to $68 | $6,000 to $10,200 | about 32% above | 2 |
| Metal | $29 to $70 | $4,350 to $10,500 | about 10% above | 2 |
| Cedar | $25 to $47 | $3,750 to $7,050 | about 14% below | 1 |
| Bamboo | $18 to $41 | $2,700 to $6,150 | about 31% below | 1 |
| Composite | $20 to $30 | $3,000 to $4,500 | about 48% below | 1 |
Figures are installed prices before gates, permits, and removal of an existing fence. Materials with only one or two local quotes will move as more companies list pricing.
Fence Companies in Independence
11106 E Winner Rd, Independence, Missouri
Contractors Nearby
Kansas City, MO ~9 mi
2901 E 85th St, Kansas City, Missouri
Shawnee, KS ~17 mi
Lee's Summit, MO ~13 mi
Blue Springs, MO ~9 mi
Liberty, MO ~11 mi
Hiring a Fence Installer in Independence
Quotes in Independence vary by more than material. Post depth has to clear the local frost line, sloped lots need stepped or racked panels, and tearing out an old fence is usually billed separately. Ask every company whether the number covers haul-away, permit filing, and utility locates before you compare it against anyone else's.
The spread here is wide: bamboo starts at $18 per foot while metal reaches $70. On a 150-foot run that is a difference of roughly $7,800.